Service

Scaffold Towers
across Essex

Mobile and static scaffold towers for the jobs that don't justify a full scaffold — window cleans, sign installs, internal high-level works, painting and short-duration repairs.

£10M Insured

Same-Day Quotes

CISRS Trained Crews

About this service

Why Essex builders choose us for scaffold towers

A scaffold tower is the fastest way to get a safe working platform up for a short job. We supply, erect and dismantle aluminium and steel towers to PASMA standard, with toeboards, handrails and stabilisers fitted as a matter of course.

Where you'd normally hire and self-erect, we'll often beat the day-rate by handling the build for you — meaning your team works from minute one rather than spending two hours reading instructions. Towers are inspected and tagged the same as any other scaffold.

Common uses: shop sign installation, internal warehouse lighting, school hall painting, gutter repairs, EICR works at height, and CCTV / alarm installs.

What's included as standard

  • PASMA-erected mobile aluminium towers up to 12m
  • Static steel towers for longer-duration jobs
  • Same-day & next-day delivery across Essex
  • Indoor and outdoor configurations available
  • Stair towers for heavy or frequent material movement
  • Inspection tags and handover certificates included

Our process

From phone call to strike — how it works

Towers are short, sharp jobs. The whole process — from call to tower-up — is usually completed inside 24 hours, and the paperwork is just as compliant as it would be on a full independent scaffold.

1

Quick spec call

Tell us the height, working surface (indoor / outdoor), and number of operatives. Two minutes is enough.

2

Same / next-day quote

Fixed price for supply-and-erect, including delivery, build, tag and dismantle.

3

Delivery to site

Tower arrives in component form on a small wagon — fits through a single doorway for indoor jobs.

4

PASMA build

A PASMA-card holder erects the tower, fits handrails, stabilisers and toeboards, signs the green tag.

5

You work safely

Scaftag in place, written handover certificate provided, weekly re-inspection if hired longer than 7 days.

6

Strike & remove

Phone call and we collect — most tower strikes take 30 minutes from arrival to wagon-away.

Safety & compliance

Safety first, every job

Scaffold towers are the most misused piece of access kit on UK sites — usually because crews self-erect with missing components. We supply complete, tagged, PASMA-signed towers every time.

Standards we work to

  • PASMA-card holders build every tower we supply
  • Stabilisers and outriggers sized to the height
  • Toeboards on all four sides at every working lift
  • Double-handrail and mid-rail to current PASMA spec
  • Green tag fitted on completion, handover slip signed
  • Weekly re-inspection if hired beyond 7 days
  • Compatible with your site's PUWER and LOLER regime
  • Non-marking wheels available for finished interiors

Pricing

What affects the price of scaffold towers?

Tower pricing is simple because the kit is standardised. Hire rate, build labour, delivery and pickup — that's it. No site licence, no tying, no design fee for most jobs.

Get my fixed price
  • Tower height (3m, 6m, 9m, 12m standard)
  • Indoor (non-marking wheels) vs outdoor build
  • Single user, span tower or stair access
  • Aluminium for mobility or steel for long-duration
  • Hire duration beyond the standard 7 days
  • Out-of-hours or weekend delivery slots
  • Supply-only versus our PASMA build crew
  • Multiple tower discounts across the same site

FAQs

Scaffold Towers questions, answered

Can I hire a tower without your crew erecting it?

Yes — supply-only is available with delivery, but most clients prefer the erected option for speed and safety.

What's the maximum height you'll go to with a tower?

12m externally as standard. Above that we'd usually recommend a tied independent scaffold.

Are towers suitable for indoor warehouse work?

Absolutely — we supply non-marking-wheel mobile towers ideal for warehouse floors.

Need a tower in a hurry?

Call us — most towers go out the same day. Indoor, outdoor, single-user or stair access, all PASMA-built.